Skip to content
Rideau River HDD Crossing
Directional DrillingOttawa, ON2023

Rideau River HDD Crossing

Installed a bundle of fibre-optic conduits beneath the Rideau River without disturbing the banks, navigation, or riparian habitat.

This project drew on our Directional Drilling capability. Installing utilities beneath obstacles — without disturbing the surface.

Scope of work

  • Horizontal directional drilling beneath an active waterway
  • Bundle of HDPE conduits pulled in a single shot
  • Entry and exit pits in confined urban right-of-way
  • Full site restoration

More Directional Drilling projects

Have a project like this?